Capitol paving: latest construction methods.
Join with local experts to help with capitol paving.
[sc name=”fp-middle1″ ]FAQ
Frequently Asked Questions
Q. who invented asphalt paving
A. To give you the best response about who invented asphalt paving call our experts [sc name=”cta-phone”]
Q. what is the unit weight per sy for 25mm paving compacted
A. This is a common question, to get the best information about what is the unit weight per sy for 25mm paving compacted contact our experts [sc name=”cta-phone”]
Q. what temperature for paving
A. A. Great question, to learn more about what temperature for paving contact our experts [sc name=”cta-phone”]
Paving Permits
capitol paving
Permit Number | Permit ID | Permit Specification | Date |
---|---|---|---|
Q022019365E02 | 107 | LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY IS PROHIBITED. THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS. | 12/31/2019 03:04:04 PM |
M022019365I96 | OCMC76 | CONTRACTOR MAY NOT REMOVE OR RELOCATE ANY PARKING METERS OR BLOCK PUBLIC ACCESS TO MUNI-METERS WITHOUT FIRST OBTAINING APPROVAL FROM NYCDOT PARKING METER DIVISION AT 646-892-1224/1208. | 12/31/2019 03:05:23 PM |
M012019365C26 | BIKE03 | IF WORK IMPACTS A SHARED VEHICLE AND BICYCLE LANE, THE PERMITTEE MUST POST THE SIGN ASSEMBLY SC-151 AND SC-152 AT THE WORK ZONE AND THE SIGN ASSEMBLY SC-145 AND SC-152. IF THE 50 FEET FALLS WITHIN THE INTERSECTION, IT SHOULD BE INSTALLED ON THE APPROACH TO THE INTERSECTION AND ON THE SIDEWALK AT A LOCATION BETWEEN THE CROSSWALK AND STOP BAR. FOR SIGN ASSEMBLY INFORMATION SEE BIKE MPT DESIGN GUIDELINES. PERMITTEE MUST COMPLY WITH THE BIKE MPT DESIGN GUIDELINES, WHICH ARE AVAILABLE AT https://www1.nyc.gov/html/dot/downloads/pdf/bike-mpt-guidelines.pdf | 12/31/2019 03:08:28 PM |
B012019365D60 | TMC001 | CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMC@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK | 12/31/2019 03:14:27 PM |
M022019365J80 | TMC001 | CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMC@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK | 12/31/2019 03:15:49 PM |
Q022019365F54 | 038 | ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). OBTAIN THE MUTCD AT HTTP://MUTCD.FHWA.DOT.GOV . | 12/31/2019 03:52:33 PM |
B022019365G30 | 066 | DO NOT PLACE MATERIALS, TRAILERS,CRANES, CONTAINERS, OR EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR BLOCKING ACCESS TO DEP WATER TESTING BOXES. IF WORK IS DIRECTLY IN ABOVE AREAS, MAY BE IN VICINITY DURING STIPULATED WORK HOURS BUT NOT WHEN SITE IS UNATTENDED. | 12/31/2019 04:32:42 PM |
M022019365L23 | 049 | OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURBLINE | 12/31/2019 04:55:36 PM |
Capitol Paving
in Venice Beach, California
Is it a good day for laying pave stones?
Local Weather in Venice Beach, California
Gabor + Allen

Architects, Landscape Gardeners
+13239036313
1070 Amoroso Pl, Venice, CA 90291, United States
Pacific Outdoor Living

Landscaping, Landscape Gardeners, Masonry/Concrete
+18182758271
8309 Tujunga Ave, Ste 201, Sun Valley, CA 91352, United States

Comments are closed