Advanced asphalt paving: latest construction methods.
Work with local experts to help with advanced asphalt paving.
[sc name=”fp-middle1″ ]FAQ
Frequently Asked Questions
A. This is a question our experts get a lot, to get the best information about how to measure for paving around the pool contact our experts [sc name=”cta-phone”]
A. Good question, contact our experts [sc name=”cta-phone”] to find out more about how to measure for paving around the pool*This is a common question, to get the best information about which tipe of rock rock i can use for asphalt paving contact our experts [sc name=”cta-phone”]*Great question, to learn more about how does urbanization paving etc affect runoff and infiltration contact our experts [sc name=”cta-phone”]*To give you the best response about how to measure for paving around the pool call our experts [sc name=”cta-phone”]*Please call us about which tipe of rock rock i can use for asphalt paving so we can best answer your question [sc name=”cta-phone”]*Interesting question, call our experts [sc name=”cta-phone”] to find out more about how does urbanization paving etc affect runoff and infiltration*This is a question our experts get a lot, to get the best information about how to measure for paving around the pool contact our experts [sc name=”cta-phone”]*Excellent question, to learn more about which tipe of rock rock i can use for asphalt paving contact our experts [sc name=”cta-phone”]*To give you the best response about how does urbanization paving etc affect runoff and infiltration call our experts [sc name=”cta-phone”]*Please call us about how to measure for paving around the pool so we can best answer your question [sc name=”cta-phone”]
A. A. Great question, to learn more about how does urbanization paving etc affect runoff and infiltration contact our experts [sc name=”cta-phone”]
Paving Permits
advanced asphalt paving
Permit Number | Permit ID | Permit Specification | Date |
---|---|---|---|
B012019365D56 | TMC001 | CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMC@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK | 12/31/2019 03:03:28 PM |
M022019365J12 | 091 | THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION AND WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS. | 12/31/2019 03:05:31 PM |
M022019365J46 | 011 | POST SIGNS MEETING NYCDOT SPECIFICATIONS FOR DIRECTING PEDESTRIANS TO OPPOSITE SIDEWALK. SIGNS MUST BE POSTED AT WORK ZONES AS WELL AS BOTH INTERSECTIONS OF AFFECTED SIDEWALK. | 12/31/2019 03:07:44 PM |
B012019365D61 | 019 | WORK 7AM – 6PM, MONDAY THROUGH FRIDAY | 12/31/2019 03:14:28 PM |
Q012019365D59 | 019 | WORK 7AM – 6PM, MONDAY THROUGH FRIDAY | 12/31/2019 03:21:38 PM |
Q022019365F47 | 066 | DO NOT PLACE MATERIALS, TRAILERS,CRANES, CONTAINERS, OR EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR BLOCKING ACCESS TO DEP WATER TESTING BOXES. IF WORK IS DIRECTLY IN ABOVE AREAS, MAY BE IN VICINITY DURING STIPULATED WORK HOURS BUT NOT WHEN SITE IS UNATTENDED. | 12/31/2019 03:48:57 PM |
M012019365C37 | TMC001 | CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMC@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK | 12/31/2019 04:34:21 PM |
B022019365G82 | TMC001 | CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT TMC@DOT.NYC.GOV & 718-433-3390/40 AND AWAIT DIRECTION PRIOR TO CONTINUING WORK | 12/31/2019 10:01:50 PM |
Advanced Asphalt Paving
in Surprise, Arizona
Is it a good day for laying pave stones?
Local Weather in Surprise, Arizona


